WELDMENTS
CELL TOWER REINFORCEMENT

CLIENT NEED
The client was a start-up engineering firm in need of a team of mechanical CAD designers, CAD software installation and configuration, software customization, as well as training...
OUR SOLUTION
DESIGNRESOURCES assembled and trained a design team of four who were productive in three weeks... We installed and configured the design group's 3D CAD software and developed CAD standards and parametric-driven design tables used to automate the design and documentation process...
SHEET METAL
DUST COLLECTOR

CLIENT NEED
The client required a dust collector fabricated from food grade stainless steel sheet metal which would be installed on an existing bakery production line...
OUR SOLUTION
We successfully designed a double hooded vacuum system that allows quick removal and reattachment of the exhaust hoods to minimize production down time and to provide easy access to internal components during cleaning and general maintenance...
SHEET METAL
BOTTLE CAP PRE-HEAT

CLIENT NEED
The client had a project that stalled in the concept stage after 6 months of development... After resurrecting the project the client requested that as many fabricated parts as possible be designed as sheet metal components...
OUR SOLUTION
The project completed and shipped 3 months after we became involved... Nearly 85% of the fabricated parts were successfully designed as sheet metal components...
PNEUMATICS
MEASURING STATION

CLIENT NEED
The client's existing spooling machine had a measuring accuracy of only +/- 300 mm, resulting in the need to add expensive overages to customers orders to ensure customers were not short changed in the received product...
OUR SOLUTION
We designed a Spooling Machine with a measuring accuracy of +/- 50 mm, resulting in $100,000 /yr in product savings...
PNEUMATICS
SEWING STATION

CLIENT NEED
The client wanted to reduce the cost of the prototype machine by consolidating and reducing the number of manufactured parts by 25%...
OUR SOLUTION
We redesigned and reconfigured manufactured components to reduce the number of parts of the prototype by nearly 50%...
PLASTICS
EYE GLASS LIGHT
CLIENT NEED
The client's prototype was designed with a fragile discreet on-off switch and the client felt the aesthetics were harsh and the ergonomics uncomfortable...
OUR SOLUTION
The ergonomics were redesigned for a softer more soothing feel and the aesthetics were given flowing contours... A robust easy-access push button on-off switch was also incorporated...
PLASTICS
WATER PLAY STATION

CLIENT NEED
The client's prototype lacked a gentle contour to its shape and appearance and was missing built-in handling features... It also needed an improved locking mechanism to ease disassembly and reassembly... And improvements were needed for the self-sealing components of the internal pump...
OUR SOLUTION
We redesigned the ergonomics, aesthetics, locking mechanism, and internal pump seal interlock components... Proof-of-concept sign-off allowed the project to enter the next phase of development...
DOCUMENTATION
MEASURING STATION
ASSEMBLY


ROOF
DISCHARGE TERMINAL

